CETN IV-20
September 1999
Figure 8. Sediment budget for "Post-Inlet: Gross Sink"
Step 5: Post-Inlet: Bypassing Begins. This sediment budget is a slight modification of the
previous alternative. Within the Cell Properties Menu for the ebb-tidal shoal, a dependency for
inlet bypassing is established, Q13 = 0.25 (Q11 + Q12). The dependency for Q9 is modified
from the previously set value such that Q9 = 0.25 (Q12+Q11). The budget is balanced for
each of the remaining cells by using the residual as an indicator of the required volume change
rate. Figure 9 shows the balanced budget.
12